Welcome to your FWM Final 3
On a thinning site in December, machine operators work into darkness. The forwarder has poor lights, and cutters use headtorches. No artificial lighting is provided. Which TWO controls must the FWM enforce under GMHSF, PUWER, and Workplace Regs?
On a hot, dry summer day, you observe sawyers decanting petrol into saws from 20-litre drums without funnels, and a mechanic welding a forwarder within 5 metres of the fuel cache. No spill kit or fire extinguishers are on site. The contractor insists “it’s forestry — this is normal practice.” Which TWO FWM interventions are required under COSHH, FISA Firefighting, and HASAWA?
You are called to a site where a forwarder is bogged axle-deep in a peat hollow. The crew is preparing to winch it out using another forwarder anchored to a tree. The rope is kinked, no pulley blocks are used, and the winch operator is standing in line with the rope to “see what’s happening.” Chainsaw operators are still cross-cutting within the radius of the rope. The contractor insists “we’ve done this a hundred times.” Which TWO actions must the FWM enforce under GMHSF, FISA Debogging, and PUWER?
On a young restock site, operators use ATVs with unbraked trailers to move materials uphill. None wear helmets or protective boots. The RA notes “experienced drivers” but omits slope hazards. One ATV overturns but the rider escapes injury. Which TWO actions must the FWM enforce under FISA ATV, PUWER, and GMHSF?
A clearfell on steep ground has multiple hazards: cable-assisted harvesting, chainsaw operators, and a 30-minute access track. Welfare is at the roadside, no radios work in the valley, and the RA does not list evacuation times. The contractor argues “everyone knows the site” and claims that because the work is short-term, detailed planning is unnecessary. Which TWO actions are mandatory for the FWM under GMHSF and FISA Emergency Planning?
A large clearfell site sits on steep ground, 40 minutes from the main road. Mobile coverage is patchy, and forestry workers are operating chainsaws, harvesters, and forwarders across multiple coupes. During a safety inspection you notice there is no clear muster point, emergency contact information is not written down, and one cutter is working out of sight. The contractor insists “everyone knows the woods” and argues formal plans aren’t necessary. Which TWO actions are mandatory for the FWM under GMHSF, FISA Emergency Planning, and the Management of Health and Safety at Work Regulations?
On a summer restock, a mulcher generates sparks on brash, no extinguishers are present, and noise exceeds 95 dB for workers and nearby walkers. Operators also report tingling fingers after full days of brushcutting. Contractor says, “fires are rare, and numbness is just cold.” Which TWO integrated actions are FWM duties under GMHSF, COSHH, and Noise/Vibration Regs?
At a mechanised clearfell in July, you observe a harvester sparking against stone. Brash piles are smouldering, no fire beaters or water bowsers are on site, and the risk assessment makes no mention of fire. The contractor argues that “the Fire Service is responsible for fires, not us.” Which TWO actions are FWM obligations under GMHSF, FISA Firefighting, and MHSWR?
A brash mulcher works next to a rural community path. Residents complain of prolonged 95 dB noise. The RA states “PPE required” but does not cover public exposure. Which TWO FWM controls are mandatory under the Control of Noise Regs, HASAWA, and GMHSF?
A steep-slope site is operated by 10 cutters and 3 machine operators over 4 weeks. Welfare is a single water bowser and first-aid kit. No toilets or shelters are present. Workers complain about poor hygiene and illness. The contractor argues “they’re subcontractors so welfare isn’t our duty.” Which TWO actions are FWM responsibilities under FISA Welfare, GMHSF, and Workplace Regs?
A contractor has supplied an excavator with a fabricated felling head, welded locally and not CE marked. The operator insists he is competent, but there is no design documentation or stability calculation. He plans to use it to fell, lift, and stack timber close to a roadside where the public occasionally pass. Which TWO responsibilities fall directly to the FWM under PUWER and HASAWA?
On a busy forest road used by walkers and cyclists, you find timber lorries queuing to load. There is no traffic marshal or signage. Children on bikes are passing within 2 metres of loaders. The contractor says the public “shouldn’t be here” and insists haulage cannot stop. Which TWO FWM duties apply under GMHSF, FISA Timber Haulage, and Workplace Regs?
After storms, a site has multiple windblown trees. The RA mentions chainsaws but not unstable hung-ups. A saw operator begins felling without winch assistance. Contractor claims “he’s done windblow before.” Which TWO FWM actions apply under FISA 303, GMHSF, and PUWER?
On a 6-week harvesting project, you find 12 workers on site — a mix of PAYE employees and subcontractors. Welfare consists of a pickup truck with bottled water and no toilet. Workers report they must “go into the trees” to relieve themselves. The contractor insists welfare is unnecessary because “they’re all self-employed.” It is winter; temperatures are below freezing. Which TWO FWM duties apply under FISA Welfare Guide, GMHSF, and Workplace Regs 1992?
On a thinning site, 12 workers have only bottled water and a pickup truck as welfare. Fuel and pesticide containers are stored together near a ditch. One subcontractor says “we don’t expect toilets in forestry,” while another insists small volumes of chemicals “aren’t covered by COSHH.” Which TWO actions must the FWM enforce under COSHH, GMHSF, and Workplace Regs?
During road building, an excavator strikes warning tape for a buried fibre cable. The RA lists OHPLs but not underground utilities. Contractor says “it’s only data.” Which TWO FWM duties apply under Electricity at Work Regs, PUWER, and GMHSF?
At an urban fringe coupe, felling occurs near OHPLs, an underground water main, and a public bridleway. No DNO contact has been made, utilities aren’t mapped, and horse riders pass within 10m of fellers. Contractor argues “the public shouldn’t be here, and lines are insulated.” Which TWO actions are critical for the FWM under GMHSF, HASAWA, and Electricity at Work Regs?
On a roadside felling job, a subcontractor provides chainsaw operators with no training records. Timber lorries queue unsafely, blocking a public road. The main contractor insists “each firm is responsible for its own.” Which TWO responsibilities must the FWM enforce under PUWER, GMHSF, and HASAWA?
A brushing crew works full days with strimmers and hedgecutters. Operators complain of tingling fingers but it is dismissed as “cold weather.” There is no job rotation, HAVS assessment, or health surveillance. Which TWO controls must the FWM apply under Control of Vibration Regs, GMHSF, and COSHH?
A contractor proposes to use an excavator‑mounted grapple saw for sectional dismantle above a public area where people may pass below. Considering PUWER and (if lifting over persons is possible) LOLER, which TWO FWM actions are mandatory?
During a mechanised clearfell in July, smoke is spotted from the harvester’s engine bay. The fire extinguisher is missing, and the RA makes no reference to summer fire risk. The contractor argues “we’ll just keep a shovel handy.” Which TWO actions must the FWM enforce under FISA Firefighting, PUWER, COSHH, and GMHSF?
During an inspection you find chainsaw fuel, hydraulic oil, and pesticide containers stored together in an unlocked trailer close to a watercourse. No spill kits are evident. The contractor argues “they’re all sealed” and insists COSHH isn’t needed for small volumes. Which TWO controls must the FWM enforce under COSHH, PUWER, and GMHSF?
You’re engaged by a private landowner who directly hires contractors but doesn’t realise this makes him the FWM under GMHSF. He believes “the contractor handles safety.” Which TWO statements reflect the true legal duty?
During a brash mulching operation, you observe workers near the machine without hearing protection. The operator says he “takes the muffs off to hear instructions.” The RA mentions PPE but doesn’t include monitoring or health surveillance. Noise levels are above 85dB. Which TWO actions are mandatory under PUWER, GMHSF, and the Control of Noise Regs?
A contractor proposes to carry out roadside felling at night to avoid daytime traffic disruption. No artificial lighting or signage plan is in place. The contractor argues “the road is quiet at night.” Which TWO controls must the FWM enforce under GMHSF, Workplace Regs, and HASAWA Section 3?
A team of 8 is working on a thinning operation in mid-winter. They are 25 minutes from the nearest facilities. The contractor proposes to bring only bottled water and a first aid kit in a pickup, arguing “we’re self-employed so welfare doesn’t apply.” Snow is forecast and workers will be outside all day. Which TWO actions must the FWM enforce under FISA Welfare Guide, GMHSF, and Workplace Regs 1992?
A restock site is crossed by an 11kV overhead line and a public bridleway. Exclusion zones are not taped, and horse riders are observed crossing near a forwarder. The contractor says, “we can’t stop the public using their rights of way.” Which TWO controls must the FWM implement under GMHSF, FISA Electricity, and HSR25?
A restock site is crossed by an 11kV overhead line and a public bridleway. Exclusion zones are not taped, and horse riders are observed crossing near a forwarder. The contractor says, “we can’t stop the public using their rights of way.” Which TWO controls must the FWM implement under GMHSF, FISA Electricity, and HSR25?
During a thinning operation near a steep riverbank, a forwarder begins loading timber within 5 metres of the bank edge. No ground stability assessment has been carried out, and workers are standing below the slope marking logs. The contractor insists “the bank has always been stable.” Which TWO FWM actions are required under GMHSF, PUWER, and HASAWA?
At a roadside clearance operation, an excavator-mounted grapple saw is being used to dismantle hung-up windblown trees. The operator has chainsaw qualifications but no documented competence in the excavator or the attachment. No lift plan exists. The contractor says LOLER does not apply because “we’re not lifting people.” Which TWO FWM actions are required under PUWER, FISA 608, and GMHSF?
At roadside stacking, excavators load timber while cutters pass within metres. RA says “operator vigilance” but no banksman, barriers, or exclusion zones exist. The contractor argues “they’ve done this for years.” Which TWO duties are mandatory for the FWM under FISA Excavators in Tree Work, PUWER, and GMHSF?
A planting site uses herbicide sprays for competing vegetation. PPE is limited to gloves, and containers are stored beside a watercourse. One worker without PA1/PA6 applies chemical. Which TWO actions are essential for the FWM under COSHH, FISA Pesticide Guidance, and GMHSF?
A forwarder operator plans to haul timber under 33kV overhead power lines, raising the crane boom above safe clearance. The constraints map mentions OHPLs but no exclusion zones are taped. The operator argues “I know the line’s safe” and wants to carry on. Which TWO duties must the FWM apply under FISA Electricity and Electricity at Work Regs 1989?
At roadside stacking, operators manually move large logs to “straighten the pile.” Several complain of back pain. The RA lists mechanical aids but none are on site. Which TWO FWM duties apply under GMHSF, PUWER, and Manual Handling Regs?
During a harvesting contract, crews are working 14-hour shifts to “catch up.” Operators admit to near misses due to tiredness. No fatigue plan exists. Contractor argues “they’re paid by output.” Which TWO FWM responsibilities apply under GMHSF, HASAWA, and Working Time Regs?
You visit a windblow clearance site where chainsaw operators are working scattered across a valley. The risk assessment is pinned inside a welfare cabin at the top of the track but does not detail evacuation times or muster points. There is no mobile phone coverage; one operator has been working alone for 45 minutes. A contractor argues that “chainsaw men know their own risks” and insists emergency planning is the crew’s responsibility. Snow is forecast and the site has limited access tracks. Which TWO actions are the FWM’s legal duties under GMHSF, FISA Emergency Planning, and the Management of Health and Safety at Work Regs?
On a thinning site, one subcontractor provides untrained chainsaw labour. Another subcontractor is responsible for haulage but parks trucks across a public road, causing near-misses with cars. The main contractor insists, “each firm handles its own staff.” Which TWO duties are essential for the FWM under GMHSF, PUWER, and HASAWA?
A team of four cutters are working 30 minutes from the nearest public road. One contractor argues that a single vehicle first‑aid kit is sufficient. Under FISA guidance, HSE first aid (INDG214) and GMHSF, which TWO FWM duties apply?
Timber lorries block a public road outside the site. Cyclists weave between parked trucks, and no signage or traffic control is in place. The contractor says, “we can’t manage highways.” Which TWO FWM responsibilities apply under GMHSF, FISA Timber Haulage, and HASAWA?
A steep-slope site is operated by 10 cutters and 3 machine operators over 4 weeks. Welfare is a single water bowser and first-aid kit. No toilets or shelters are present. Workers complain about poor hygiene and illness. The contractor argues “they’re subcontractors so welfare isn’t our duty.” Which TWO actions are FWM responsibilities under FISA Welfare, GMHSF, and Workplace Regs?
Vegetation management requires herbicide application within 10 m of a watercourse on sloping ground. In line with COSHH, PUWER and FISA guidance, which TWO FWM controls are mandatory?
A felling site borders Network Rail land; several trees could foul the line if mis‑directed. The contractor wants to proceed without notifying the operator. Under FISA (working next to railways) and GMHSF, which TWO FWM obligations apply?
A site borders a salmon river. Forwarders are crossing a ford daily; oils and debris enter the water. No pollution plan exists. The contractor says, “we’ve always crossed here.” Which TWO FWM actions are required under GMHSF, COSHH, and Environmental Permitting Regs?
On a thinning site, one subcontractor provides untrained chainsaw labour. Another subcontractor is responsible for haulage but parks trucks across a public road, causing near-misses with cars. The main contractor insists, “each firm handles its own staff.” Which TWO duties are essential for the FWM under GMHSF, PUWER, and HASAWA?
On a restock site in late summer, you notice fuel is stored in 20-litre plastic drums left in the open beside the brash mat. No bunded storage is present and the drums are within 15 metres of a ditch that flows into a nearby stream. Welfare provision is limited to bottled water in the back of a pickup truck and there are no washing facilities, even though ten operators are on site for 12-hour shifts. The contractor insists “fuel is sealed, it’s fine” and argues that “these are all subcontractors, so welfare isn’t my duty.” Which TWO actions must the FWM enforce under COSHH, GMHSF, and Workplace Regs?