hwtraining.co.uk
 

FWM Exam 2

Home | Quizzes & Surveys | FWM Exam 2

Welcome to your FWM Exam 2

Multiple Choice

A 10-person crew is on a remote site. Only one small first aid kit is provided.

Multiple Choice

A chainsaw operator is struck by a falling tree and suffers a fracture requiring hospital treatment. The contractor wants to resume work next day, handling it internally.

Multiple Choice

On a week-long planting site with 10 workers, there are no toilets, hand-washing facilities, or shelter. The contractor insists it’s too short to justify welfare investment. Workers are eating lunch in vehicles.

Multiple Choice

Two chainsaw operators fell trees while a forwarder extracts nearby. The contractor says it’s efficient and wants to continue overlap.

Multiple Choice

Storm warnings predict gale-force winds mid-week. The contractor wants to keep working “until it’s too bad.” The landowner wants deadlines met.

Multiple Choice

During refuelling, a forwarder leaks diesel onto soil near a watercourse. The contractor proposes covering it with soil and continuing work.

Multiple Choice

After work, stacked timber remains near a public road and an access gate is partly open. The landowner assumes no one enters after hours.

Multiple Choice

The contractor brings in a new subcontractor crew mid-project that was not included in initial safety briefings. They have different work practices.

Multiple Choice

A clear-fell site borders a busy public road. Trees could reach traffic if not controlled. The RA notes “traffic nearby” but has no specifics. The landowner wants to avoid road closures to keep haulage flowing.

Multiple Choice

A harvester uncovers an unmarked mine shaft near a stacking area. The landowner had not disclosed it. A lorry is due shortly; the contractor suggests fencing later in the week.

Multiple Choice

A contractor proposes using an old skidder without ROPS since their newer machine is in repair. They promise to be careful on slopes.

Multiple Choice

You detect a machine operator smells of alcohol and appears sluggish. The contractor is short-staffed and wants him kept working.

Multiple Choice

An access bridge shows structural weakness. The haulier wants to cross with a loaded lorry, claiming it’s been fine before.

Multiple Choice

A chainsaw operator suffers a deep cut requiring hospital stay. The contractor says no need to report as it slows us down.

Multiple Choice

A chainsaw operator fells a tree which hangs up in another. The crew considers solutions to bring it down quickly.

Multiple Choice

Felling is planned near a riverbank. Ground is unstable; machines risk sliding toward water, especially when wet.

Multiple Choice

A chainsaw operator is felling within 30 m of a forwarder despite an agreed 70 m exclusion. The contractor argues productivity comes first.

Multiple Choice

Site has dry brash piles during hot weather. Chainsaw operators smoke during breaks. No fire plan exists.

Multiple Choice

Workers use chainsaws all day. No RA on noise/HAVS has been done. The contractor says they all wear ear defenders.

Multiple Choice

A chainsaw operator is also assigned to spray herbicide alone along young trees, miles from the site, with no mobile coverage. The contractor argues “he’s experienced.”

Multiple Choice

A cluster of unstable diseased trees stands near a public road. The contractor proposes felling them using chainsaw operators with only basic certification. The landowner wants the trees cleared urgently.

Multiple Choice

At a large coupe, felling and forwarding overlap. A lorry arrives early and drives close to active chainsaw work. No coordination schedule or exclusion zones were agreed.

Multiple Choice

The landowner visits and orders the crew to fell an extra tree near a powerline, not in the plan, “for the view.” The contractor looks ready to comply.

Multiple Choice

A timber lorry driver enters the stacking area without helmet or hi-viz. The contractor argues PPE rules don’t apply to visitors.

Multiple Choice

A coupe is 5km from the nearest road with poor phone coverage. The contractor has no emergency plan, saying “we’ll sort it if something happens.” Only basic first aid kits are present and there are no grid references available.

Multiple Choice

A forwarder nearly tips on a slope while overloaded. No injuries occur. The contractor calls it “just a close call” and wants to continue. The RA is outdated for current ground conditions.

Multiple Choice

You arrive to manage a 40-hectare clear-fell site. The landowner insists felling must start immediately to satisfy a timber contract. The crew is waiting, but no site-specific risk assessment (RA) has been completed. A public footpath cuts through the coupe, and the ground is unstable after heavy rain. The contractor suggests starting “carefully” and updating the RA later.

Multiple Choice

Crew working 10-hour days for a week show fatigue; a minor felling error occurred. Deadline is close and contractor wants another long day.

Multiple Choice

At induction you discover a contractor has brought a worker for chainsaw felling with no proof of training or certification. The contractor insists he is “experienced enough.” The RA assumes all chainsaw operators are competent.

Multiple Choice

One subcontractor repeatedly skips PPE and safety checks. The main contractor hesitates to act because he is productive.

Multiple Choice

In planning a thinning, you discover a high-voltage overhead line cutting across the site. The contractor proposes to “just be careful” to keep on schedule. The RA does not mention electrical hazards. The landowner warns of penalties if harvesting is delayed.

Multiple Choice

You observe chainsaw operators using poorly maintained saws with blunt chains. The contractor says they’ll cope until end of week.

Multiple Choice

You must select a harvesting contractor. One is cheaper but has poor safety history, outdated equipment, and uncertified chainsaw operators. Another is more expensive but has current certification, trained staff, and compliant machinery. The landowner demands costs be minimised.

Multiple Choice

A chainsaw operator arrives mid-project with certification but no site-specific induction. The contractor wants him to start immediately to catch up on delays.

Multiple Choice

Contractor provides drinking water but no hand-washing facilities for pesticide spraying team.

Multiple Choice

You manage a 30-ha site with complex windblow and cannot be on-site daily. The contractor insists they’ll self-manage.

Multiple Choice

A chainsaw operator requests to fell trees alone in a remote block. The contractor argues he’s competent. No lone working procedure exists.

Multiple Choice

Warning signs at a public access point blew down overnight. Chainsaw operators and machines are active.

Multiple Choice

A 2-week harvesting job crosses a popular hiking trail. No signage or diversions are in place. Walkers approach the felling zone. The RA mentions “public presence” but contains no controls. The contractor claims machinery noise will deter the public.

Multiple Choice

During operations you observe a chainsaw operator working without protective trousers due to hot weather. The contractor admits relaxing PPE rules to maintain production. The landowner is visiting later and wants the site to look productive.

This site uses cookies.
ConfigureHide Options
 
Read our privacy policy

This site uses cookies for marketing, personalisation, and analysis purposes. You can opt out of this at any time or view our full privacy policy for more information.